Services

Loadout & Barging

·

·

·
 
Complicated Loadout procedures at private shipyard, Singapore

Loading & discharging by 250Te Crawler Crane at both ends

Transported by
Operated by experienced trained personnel due to high SHE standard to meet client requirements

 

·


·
 
Cargo stowage on barge is strictly followed the Sea Fastening Design which certified by 3rd party MWS

New technology on lashing material increase time efficiency during lashing and unlashing

 

·

 


The used of CAD and current technology has enable us to develop the engineering and computer system requirement to design sea fastening and stowage plan.

Stability and reaction loadings can be analyzed to provide optimum safety

 


·



·


 
Complicated loadout operation required highly trained and experienced project team

Compliance with benchmark Safety Health and Environment standards is priority in our operations